Component family
List every size, drawing revision, material, finish, mass and known difficult variant.
Engineering and procurement guide
Start with the part condition the receiving process needs, then work backwards through release, buffering, orientation, elevation and bulk storage. This prevents a fast feeder being specified without a reliable production interface.

Representative production equipment; final feed path and guarding are application-specific.
Selection sequence
The minimum useful brief defines the complete component family, normal bulk condition, accepted orientation, sustained output, buffer requirement, footprint, loading method, environment and downstream controls. Samples turn assumptions into measurable evidence.
Eight-point checklist
Issue the same application pack to every supplier and require assumptions, exclusions, test conditions and the proposed acceptance method to be stated. A shared brief reduces scope gaps and quotation ambiguity.
List every size, drawing revision, material, finish, mass and known difficult variant.
Describe oil, dust, tangling, bag set, mould variation, return parts and refill batch size.
Show axis, face, pitch, datum, height, tolerance and whether pick-up or positive transfer follows.
Specify accepted parts per minute, peaks, buffer time, shift pattern and downstream stoppages.
Define hopper capacity, refill interval, low-level warning and preferred operator loading height.
Record footprint, access, noise objective, power, air, guarding and environmental requirements.
Acceptance planning
Define the sample mix, trial duration, permitted interventions, accepted rate, orientation quality, jam recovery, changeover procedure and evidence format. FAT should reproduce the important production conditions.
Straight answers
There is no universal quantity. Enough parts are needed to reproduce realistic bed depth, variation, recirculation and test duration. The supplier should confirm the required quantity after reviewing the application.
Specify sustained accepted output plus known peaks and downstream stops. This allows buffer capacity and control logic to be sized correctly.
The exact accepted hand-off condition: orientation, datum, pitch, discharge height and tolerance. A photograph or marked-up drawing prevents interpretation errors.
Before design freeze and ideally at quotation stage. Early agreement aligns tooling, sample quantities, controls and evidence with the final acceptance test.
Application review
Send representative components, drawings, required orientation, sustained output and receiving-machine details. Sortation Solutions will review the feed path and recommend the next engineering step.